Application
Bridge abutments
External concrete surfaces of storage tanks and masonry surfaces
Multistoried buildings and villas
High-external tough UV-resistant coating such as on pipe protection enamel and concrete cladding Subway
Application Methodology
Remove dust, flakes, oil, grease, or other loose foreign particles using sandblasting, an iron brush, or compressed air. Remove oil,
grease, chemical contaminants, and extraneous matter. Ensure that the substrate is sound, clean, and free from dust and all loose or
flaking material. Fill all holes and deep cracks with a suitable filler. Ensure that no trace of mold or algae remains and that the area is
treated with a suitable antifungicide or bleach solution. For new cementitious substrates, ensure that the substrate is fully cured for at
least 14 days. Stir drums thoroughly for uniformity. For best results, use a variable speed drill mixer with a spiral-type blade at the
bottom of the stirrer rod at a speed of 400-600 rpm. Dilute CLI Coat AWB by adding 10% clean water by volume and prime old,
absorbent, and weathered surfaces. On non-porous surfaces, apply CLI Coat AWB undiluted. Prime all metal substrates with CLI Prime
Zn 40. Apply CLI Coat AWB evenly at temperatures between 3°C and 30°C with a roller, brush, or airless spray. Use a two-coat system
on dark, absorbent, and heavily textured surfaces and when full carbonation protection is required. Porous, rough, and irregular surfaces
will reduce coverage rates.
Storage and Shelf Life
Store in a cool, dry place at temperatures between 5°C and 30°C, under shade, away from heat. The shelf life of the product is 1 year in
original unopened sealed condition.